VE-WV and PURELINE vertikal Vertical installation
Installation with feed from ceiling If installed flush with the ceiling,
the cables or gas pipes must
be led into the section through
an opening not bigger than
150 x 160 mm. Segregate the cables into mains-power and
low-voltage and place them in the cable ducts from above or from the side. General information on installation >
Vertical feed from ceiling/rear
Installation must be performed in
accordance with instructions,
and must only be carried out by
skilled qualified staff. Shown below:
feed from ceiling/rearEinspeisung
– Mark mounting centreline (MA) – Make opening in the wall– Insert electrical cables, allow excess length of at least 500 m– Transfer fixing points from system drawing– Drill fixing holes and fit wall plugs Installation with rear-end feed Installation instructions Install medical supply unit with rear-end feed in accordance
with instructions stated along-side. Make wall openings in accordance with the diagram
below. >
AbbreviationsOK = Upper edge
OKFFB = Top edge of finished floor on ceiling
at rear >
OK
250 2700 GAS max.160 max.150 OKFFB OK
250 2700 OK
75145150 GAS 100 120130130 OKFFB