Text version of the page
PREPARATION ON SITE 41 >
Installation of medical gases Place gas supply pipes (sup-plied by “medical gas” contrac-tor) into pipe well of feed socket
and fix in the locating strips of
the mounting template. General information on installation Installation must be performed in
accordance with instructions,
and must only be carried out by
skilled qualified staff.
Rear feed
Installation instructions Shown below: rear-end right-
hand feed (rear-end left-hand
feed mirror-inverted)
– Mark mounting centreline (MA)– Make opening in the wall– Insert electrical cables, allow excess length of at least 500 mm– Place feed socket in position– Transfer fixing points from system drawing– Drill fixing holes and fit wall plugs
Abbreviations GO = Top side of unit
GU = Underside of unit
MA = Mounting centreline
OKFFB = Top edge of finished floor 1 Feed socket rear
Order no. Nr. 20 961 567 (left-hand feed) Order no. Nr. 20 961 554 (right-hand feed)
2 Gas supply pipe front (8x1 mm)
Order no. 20 494 238 (PE 2 off)
including pipe screw fitting
3 Special wrench Order no. 20 666 558 >
1 190 72 >
60MA r)G2G3 (O)
1760 2 i 2 2540 8078 >
G1 (A 170 110 >
3 G3 (O >
2 )G2G1 (A 41010 i r)506580 >
5725GUGO
15
15 65 MA MAGUGO 35 >
OKFFB