PURELINE horizontal installation
Installation of medical gases Place gas supply pipes (sup-plied by “medical gas” contrac-tor) into pipe well of feed socket
and fix in the locating strips of the mounting template. General information concerning installation Installation must be performed in
accordance with instructions,
and must only be carried out by
skilled qualified staff.
Front-end feed
Installation instructions Shown below: Front-end right-
side supply (front-end left-side supply as mirror image) – Mark mounting centreline (MA) – Make opening in the wall– Insert electrical cables, allow excess length of at least 500 mm
– Place feed socket in position– Transfer fixing points from system drawing– Drill fixing holes and fit wall plugs
AbbreviationsGO = Top side of unit
GU = Underside of unit
MA = Mounting centreline
OK = Upper edge
OKFFB = Top edge of finished floorUK = Lower edge
WA = Wall opening 1
Feed socket front Order no. 22 147 325
(for right-hand and left-hand feed)
2 Gas supply pipe front (8x1 mm)
Order no. 20 494 238 (PE 2 off)
including pipe screw fitting
3 Special wrench Order no. 20 666 558 G1 (Air) G2 (O
2
)
1
65 >
35 70 150
2 3
170 10 85
OK WA 15
GO 20 15 MA ) 2 60 MA 45 G2 (O G1 (Air) GU5725
MA >
90 85
GUGO UK WA 1760 OKFFB >