Text version of the page
PREPARATION ON SITE 37 >
General information on installation Installation must be performed in
accordance with instructions,
and must only be carried out by
skilled qualified staff.
Rear feed
Installation instructions – Transfer fixing points from system drawing– Drill fixing holes and fit wall plugs Shown below: rear-end right-
hand feed (rear-end left-hand
feed mirror-inverted)
– Mark mounting centreline (MA)
– Make opening in the wall
– Insert electrical cables, allow excess length of at least 500 mm
– Place feed socket in position, make sure locking strips protrude
AbbreviationsGO = Top side of unit
GU = Underside of unit
MA = Mounting centreline
OK = Upper edge
OKFFB = Top edge of finished floorUK = Lower edge
WA = Wall opening 1 Feed socket rear with gas
Order no. 20 917 650
Rear feed socket
Order no. 20 917 990 a Fixing holes for plaster concrete walls 225 95 95 b Pipe wells OK WA c d Marking for mounting centreline Mounting template
2 Gas supply pipe rear Order no. 20 494 222 (PE 2 off)3 Special wrench Order no. 20 66 558 >
174630 MA a b 1 UK WA >
c 2 3 d 90 >
GO 17 >
56
GU MA
38
GO 93 1750 GUMA 45 >
OKFFB G3 (O >
2 )G2G1 (Air) >