General information on installation
VE-L and VE-L/V
Installation must be performed
in accordance with instructions,
and must only be carried out by
skilled qualified staff.
Installation
Front-end feed
Installation instructions Shown below: front-end left-
hand feed (front-end right-hand
feed mirror-inverted)
– Mark mounting centreline (MA)
– Make opening in the wall
– Insert electrical cables, allow excess length of at least 500 mm
– Place feed socket in position
– Transfer fixing points from system drawing– Drill fixing holes and fit wall plugs
AbbreviationsGO = Top side of unit
GU = Underside of unit
MA = Mounting centreline
OK = Upper edge
OKFFB = Top edge of finished floorUK = Lower edge
WA = Wall opening 1 Feed socket front left Order no. 20 494 263 Feed socket front right Order no. 20 494 250 a Fixing holes for plaster concrete walls b Pipe well c Marking for mounting centreline d Mounting template
2 Gas supply pipe front (8x1 mm) Order no. 20 494 238 (PE 2 off)3 Special wrench Order no. 20 666 558 >
1 MA G3 (O) >
2 G1 (Air)G2 50 >
c b a d 2 3 min. 4 150 >
GO 33WAOK UK WA 38 33 56
33GO MAGU MA 3065 GU 1750 52 >
OKFFB