VE-W Installation
Installation of medical gases Insert on-site gas pipes into the locating strips of the mounting template. Caution: General information on installation Mains power must always be on outside.
Oxygen (G3) must always
be on inside.Elbow couplings must be pro-cured by “medical gas” contractor. Installation must be performed
in accordance with instructions,
and must only be carried out by
skilled qualified staff.
Front-end feed
Installation instructions – Attach mounting plates, allow necessary clearances! Last
mounting plate is located 80 mm in front of outer edge of front panel Shown below: right-hand front-
end feed (left-hand front-end
feed mirror-inverted)– Mark mounting centreline (MA) – Make opening in the wall
– Insert electrical cables, allow excess length of at least 500 mm– Place feed socket in position– Mark fixing points – Drill fixing holes and insert wall plugs Caution: Fixing accessories must be appropriate to structural strength of wall; maximum tensile load per mounting plate is 260 N!
AbbreviationsGO = Top side of unit
GU = Underside of unit
MA = Mounting centreline
OK = Upper edge
OKFFB = Top edge of finished floorUK = Lower edge
WA = Wall opening1 Feed socket front left (ED-VEW) Order no. 22 089 648
Feed socket front right (ED-VEW)
Order no. 22 089 654 a Fixing holes for plaster concrete walls b Mounting template (remove in case of installation without
gases) c Fixing strips for solid walls2 Elbow coupling for CU pipe 12 x 1 mm
Order no. 22 089 673
3 Elbow coupling for CU pipe 8 x 1 mm
Order no. 22 089 667 (PE, 2 off)
a
MAOK WA >
c 1
115 160 >
2
UK WA >
40 755025
3 b
65 100
GOGU >
8080 max. 1000 max. 1000
MAUK WA
G3 (O GO 40168 OK WA 115 160 GUMA 1880 )G2