TECTON TECNOO In this example, the emergencyluminaires are connected alter-
nately to two groups, thus gua-
ranteeing optimum utilisation of
the supply unit.
SECTION CENTRAL
esigning ONTE with TECTON Typical SECTION CENTRAL schematic
1 m Bulk material: max. height 1 m >
EN1/K1EL1/K1EN1/K1EL1/K1 EN2/K2
EL2/K2
LL
Emergency operation Emergency operation Emergency operation >
(20 % dimming level) (20 % dimming level) (20 % dimming level) 2 m high shelf >
EN2/K2
EL2/K2EN1/K1EL1/K1EN1/K1EL1/K1
EL1/K1
EL2/K2EN1/K1EN2/K2
Emergency operation Emergency operation >
(20 % dimming level) (20 % dimming level) Workshop bay: 20 m long, 10 m wide, surface area 200 m >
2 K1/2/3 = Circuit 1/2/3
K1K2K3
Thanks to its two circuits (EL1/EN1 or EL2/EN2), TECTON enables standby powering of
emergency lighting in the conti-nuous-row lighting system asstandard. Non-maintained or
maintained mode can be selec-
ted and set. No additional con-trol line is required 4 poles for two independent emer-gencylighting circuits (4 x 1.5
2 ) – Clear separation of room lightingand emergency lighting– Design security during projectphase, flexibility and adaptability
after commissioning