| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | |
| | | PITERAK® | | |
| | | |
| | | DEALING WITH IRREGULAR POINTS • Dealing with openings > Jambs and lintels They must be dealt with metal subframes which are fixed to the metal framework of the structure. An adaptation of the subframe with the mounting frame of the Rterak®should be provided for. (see diagrams 16 and 17). > gins The sills can be dealt with using a metal flashing (see diagrams 14 and 15). | | |
| | | fixing point | | fixing point | | |
| | | |
| | | aluminium fladhing top fixing clip | | |
| | | aluminium flashing top fixing Cip | | |
| | | |
| | | |
| | | fixing bracket fixing plug standard fixing clip instaiation clearance 10 to 14 mm section | | |
| | | fixing bracket fixing plug standard fixng clip instaiation clearance 10 to 14 mm section | | |
| | | |
| | | |
| | | 91 mm | | |
| | | |
| | | |
| | | WALL-CLADDING INSTALLATION opening details: sill section Diagram 15 | | |
| | | DIRECT INSTALLATION opening details: sill section | | |
| | | |
| | | Diagram 14 | | |
| | | |
| | | fixing plug joinery | | |
| | | |
| | | fixing plug | | |
| | | |
| | | RTERAK 20 or 25 — | | |
| | | |
| | | DIRECT INSTALLATION opening details: jamb section | | |
| | | |
| | | Diagram 16 | | |
| | | |
| | | fixing pug joinery | | |
| | | |
| | | fixing plug | | |
| | | |
| | | Odham Art Gallery, Manchester, United-Kngdom Architects : Ringle Richards Sharratt | | |
| | | RTffiAK 20 or 25 — | | |
| | | |
| | | sill | | |
| | | WALL-CLADDING INSTALLATION opening details: jamb section | | |
| | | |
| | | |
| | | Diagram 17 | | |
| | | |
| | | edition No.6 2005 | | |
| | | |
| | | 106 | | |
| | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |