MAESTRAL ®
(see diagrams 9, 10 and 18) (see diagrams 7, 8 and 18) ? Wall top detail: end At the top of the work, the Maestral® must be
protected using a waterproof flashing overlapping
the piece.
Top Maestral® are fixed using top right and left
stainless steel clips.
DEALING WITH IRREGULAR POINTS
? Base detail: start At the starting point, it is necessary to start with a
metal section, L-shaped, drilled with holes and
fixed to the vertical wall, protecting the various
panels which constitute the cladding and enabling
the drain-off of any water thanks. Bottom Maestral® are fixed by means of bottom
right/left stainless steel clips .
Maestral bottom fixing clipprofile Maestral 7 : 106 mmMaestral 4 : 76 mm >
Maestral 7 : 145 mmMaestral 4 : 115 mm
Maestralbottom fixing clip DIRECT INSTALLATION WALL-CLADDING INSTALLATION start detail start detail Diagram 7 Diagram 8
g clip M a estr a lTop fixin >
b
top fixing clip M a estr a l 7 : 106 mmM >
Maestral 7 : 145 mmMaestral 4 : 115 mm
Maestral a estr a l 4 : 76 mm
profile >
DIRECT INSTALLATION WALL-CLADDING INSTALLATION end detail end detail Diagram 9 Diagram 10
Mathieu Ducaroy © France Télécom, Marseille, FranceArchitect : Michel Nizri >
edition No.6 2005