| | | The installation of the Z^DhinSwail-daddlng system must bedoneinacocrdancewiththeCSTB Technical Approval N^02-971. hbftazintally positioned from bottom to top with a theoretical gauge of 305 cm (advised gauge of inaaJlation is indicated on the pallet), trie rails should bef ixed to the framework in the case where insulation is interposed (or to the wall), rescectingaspacefrorn 1 to 2 cm between the ends of the rails In the same row. The interaxialdistancefor fixings of therailsis 90 cm maximum. (This interaaal distance has to be confirmed withapull test performed on the construction siteaccording to the regulations given inwcrtshea n° 1661 published by the CSBj. The architectural tiles, mairitained by suspension, will be fixed on the ewposed section with two points of mastic(typeSka/le*Ffo11 FQonthelowerlip. The aligned horizontal jointsand the vertically aligned w staggered joints of approd mat elySmm are left free, to accentuate the purity of thelines and allcw the structure to move (movement of the building) without risk of compressing of thefagade covering. A previously traced grid pattern limitsor eliminates the need for cuts. For the main body of the work the number of man-hoursisevaluated at 40 mirVrn2. If edjustmerits are required, they can be done on the construction site with a suitable oscular saw. installation of wooden and n^al lie frameworks must bedcneinaccadancewithCSBworlisneets n°.3316dated February 2001 andthemcdlfication no. 3422 (wooden frame) and n". 3194 dated February 2000 (metallic frame). Inacaseof accidental damage the piece of the broten tile does not fall, the upper part remains su^Knded.whilethelcwerpart remains glued to the rail. Wiile it is easy to replace cne tile, each garden panel being independent, it isimpcsableto remove an entire piece The choice of fixings must tateinto account the resultsol the pull tests carried cut on the construction sitesccording to C5TB worksheet n° 1661, delivery 211-July 1980. | | |