T~TRAK SYSTEM patent pending Step Two: Add Power and Hardware to Complete the System
QTY.PART NUMBER POWER FEED CANOPY: Determine how far below the
ceiling the system will be dropped.Power Feed Canopy (p.24)Choose:Type of Power FeedLength of DropIf using a power feed canopy “with connector" you can reduceyour standoff with connector count (on previous page) by one. 700TTP _______________
700TTSCC _____________ 700TTS _______________ 700TTPVLTS ___________ 700TTSVLTS ___________ >
MOUNTING: Select Rigid Standoffs with Connector (p.23) that match the
drop of the Power Feed Canopy.Refer to Length section on
previous page for quantity.Select Rigid Standoffs without Connector (p.23) that match thedrop of the Power Feed Canopy.Refer to Length section on
previous page for quantity.________________Is the ceiling vaulted? If so specify one Power Vault Adapter (p.26)for each Power Feed Canopy.___________Then specify one Standoff Vault Adapter for each Standoff.(p.26)____________ >
SPECIAL: This outline covers only the most common T~trak™ applications,but T~trak can do almost anything.For other system options,see Special Installations on pp.26-27 of the catalog,or call your local representative or Tech Lighting quotes department (800.522.5315). >
5