Text version of the page
Text version of the page
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | • Hoistway and machine room shall contain no piping or wiring not related directly to elevator operation. | | | | | | | | | | • All electric power for light, tools, hoists, welding, etc, during erection. | | | | | | | | | | • All single phase receptacles installed in machine rooms, pits and machinery spaces shall have ground fault circuit interrupter protection. | | | | | | | | | | • Guarding and protecting the hoistway during construction; the protection of the hoistway shall include removable solid home panels surrounding each hoistway opening at each floor, a minimum of 120cm high. Hoistway guards to be erected, maintained and removed by others. | | | | | | | | | | • TEMPORARY USE OF HOME ELEVATORS : Should any elevator be required for use before final completion, others shall provide without expense to the Elevator Contractor, if required, temporary car enclosures, requisite guards or other protection for elevator hoistway openings, main line switch with wiring, necessary power, signaling devices, lights in car and elevator operators together with any other special labor or equipment needed to permit this temporary usage. | | | | | | | | | | • The Elevator Contractor shall be reimbursed for any labor and material which is not part of the permanent elevator installation and which is required to provide temporary elevator service. In addition, the Elevator Contractors temporary acceptance(permission) form shall be executed before any elevator is placed in temporary service, and the cost power and operation, maintenance of the equipment and rehabilitation of equipment shall be paid for by others. | | | | | | | | | | | | | | | | | | | |
|