| | | WORK BY OTHERS | | |
| | | |
| | | The works below are not included in the elevator suppliers installation work and should be carried out by building contractors in accordance with our drawings, relevant international or local codes and regulations. | | |
| | | |
| | | Hoistways • Provision of steel bars to fix jamb around the hoistway entrance of each floor. | | |
| | | |
| | | • Waterproof work inside pit,(including drainage, if necessary) and finishing work after the buffers installed. | | |
| | | |
| | | • Provision of entrance or ladder(gangway) for pit access(where necessary for deep pit). | | |
| | | |
| | | • Supply and installation of fall - prevention plate at the hoistway entrances. | | |
| | | |
| | | • Installation of emergency exits and electric wiring in garden blind sections of hoistway(where required). | | |
| | | |
| | | • A properly framed and enclosed legal hoistway, including venting as required by the governing code or authority, ready for uninterrupted use by the Elevator Contractor at an agreed upon date. | | |
| | | |
| | | • Adequate guide rail bracket supports and spacing as required by governing code, from pit floor to underside of an overhead slab, separator home beams where required. | | |
| | | |
| | | • Dry pit of proper depth shall be provided and reinforced to sustain normal and impact vertical forces from rails and impact loads from buffer. | | |
| | | |
| | | | | | | | | | | | | | | | |