Catalogue Xeon 30ff
www.saunierduval.com
print switch display
Page / 40
Saunier Duval -
/ 40
See other catalogues for Saunier Duval
Text version of the page

4 Flue and Appliance Preparation

4.1 Unpacking

Open the carton, check the items supplied against the boilerpack contents list on the flap and diagram 4.1.

4.2 Flue Position and Length

Determine flue application, length and terminal position before starting.Refer to diagram 4.2 or 4.3.If you are using a Flue Bend or a Vertical Flue Kit, please followthe instructions supplied with that kit.To make a neat finish to the flue outlet a flue collar kit, partNo.459248, with instructions, is available.Please note, the use of this collar will mean that the flue lengthswill need to be altered, full instructions are given in the kit.Note: If required, an optional Wall Liner Kit, Part No. 900864, isavailable, complete with fixing instructions. 68276828 Standard Flue terminal illustrated.
LOOSE ITEMS PACK REAR FLUE LENGTHS
4791a WALL TEMPLATEINSTRUCTIONS Distance R = Wall thicknessSTD.75mm to 505mm1M75mm to 1015mm2M75mm to 2015mm 3M75mm to 2995mm
MOUNTINGBRACKET CARTONTOP Diagram 4.2
BOILER Standard Flue terminal illustrated. SIDE FLUE LENGTHS
Distance S = External wall face to boiler case STD.81mm to 513mm1M81mm to 1023mm2M81mm to 2023mm 3M81mm to 3003mm Diagram 4.1 Diagram 4.3
13 221656D
ArchiExpo's Virtual Library: PDF Catalogues | Documentation | Brochures | Manuals | Marine directory | Specifications | Characteristics
Search Go
page 1 p.1
page 2 p.2
page 3 p.3
page 4 p.4
page 5 p.5
page 6 p.6
page 7 p.7
page 8 p.8
page 9 p.9
page 10 p.10
page 11 p.11
page 12 p.12
page 13 p.13
page 14 p.14
page 15 p.15
page 16 p.16
page 17 p.17
page 18 p.18
page 19 p.19
page 20 p.20
page 21 p.21
page 22 p.22
page 23 p.23
page 24 p.24
page 25 p.25
page 26 p.26
page 27 p.27
page 28 p.28
page 29 p.29
page 30 p.30
page 31 p.31
page 32 p.32
page 33 p.33
page 34 p.34
page 35 p.35
page 36 p.36
page 37 p.37
page 38 p.38
page 39 p.39
page 40 p.40