3 Water Systems
3.16 Filling a Sealed Water System
Provision for filling the system at low level must be made. Three methods are shown in diagram 3.6. There must be no permanent connection to the mains water supply, even through a non­return valve.
3.17 Water Makeup
Provision must be made for replacing water lost from the system. A make up vessel mounted above the highest point of the system and connected through a non-return valve to the system on the return side of either the hot water cylinder or heating system, see diagram 3.5.
Alternatively provision for make up can be made by a filling loop.
COMBINED 0051M
CHECK VALVE HEATING
AND VACUUM SYSTEM BREAKER
METHOD 1
TEMPORARY HOSE
SERVICING VALVE
SUPPLY STOP
VALVE
SUPPLY PIPE
METHOD 2
TEMPORARY HOSE
HEATING
DOUBLE CHECK SYSTEM
VALVE ASSEMBLY
jf
f
SERVICING VALVE
SUPPLY STOP VALVE
SUPPLY PIPE
METHOD 3
CISTERN
OVERFLOW
SERVICING VALVE
HEATING
PRESSURE SYSTEM REDUCING
VAL
VE
3r " pi_l~i
SUPPLY STOP VALVE
HOSE UNIONS
DOUBLE CHECK VALVE ASSEMBLY
Diagram 3.6
SUPPLY PIPE
12
221656D
ArchiExpo's Virtual Library: PDF Catalogues | Documentation | Brochures | Manuals | Marine directory | Specifications | Characteristics
Search Go
page 1 p.1
page 2 p.2
page 3 p.3
page 4 p.4
page 5 p.5
page 6 p.6
page 7 p.7
page 8 p.8
page 9 p.9
page 10 p.10
page 11 p.11
page 12 p.12
page 13 p.13
page 14 p.14
page 15 p.15
page 16 p.16
page 17 p.17
page 18 p.18
page 19 p.19
page 20 p.20
page 21 p.21
page 22 p.22
page 23 p.23
page 24 p.24
page 25 p.25
page 26 p.26
page 27 p.27
page 28 p.28
page 29 p.29
page 30 p.30
page 31 p.31
page 32 p.32
page 33 p.33
page 34 p.34
page 35 p.35
page 36 p.36
page 37 p.37
page 38 p.38
page 39 p.39
page 40 p.40