| Clearances The position of the boiler must be such that there is adequate space for servicing. The recommended clearances are: 40 mm either side of the boiler. 600 mm at the front of the boiler. 300 mm below the boiler. Fixing jig The fixing jig comprises three parts: 1) The connecting plate which allows the connection and soundness testing of all the pipework before the boiler is fitted and helps support the weight of the boiler. 2) The hook which supports the weight of the boiler. 3) The template which ensures the hook and connecting plate are correctly fitted relative to one another. • Place template on wall in required position, making allowances for the necessary clearances etc., see diagram 7. Note: It is permissible to install the boiler with reduced clearances at the bottom and sides of the boiler PROVIDING that adequate consideration is given for Servicing/Repairs at a later date. If any doubt exists, contact the Saunier Duval Technical Helpline 01773 828400. • Mark the position of the holes for the hook and connecting plate. • Drill, plug and fix the connecting plate and hook to the wall using suitable screws. • Check that both the hook and connecting plate are level. If the boiler is not installed immediately, protect the various couplings to prevent any ingress of foreign materials e.g. plaster, paint etc. Terminal position The minimum acceptable spacings from the terminal to obstructions and ventilation openings are shown in diagram 8. |