COMMISSIONING

The commissioning and first firing of the boiler mustonly be done by a competent person.
Modulation coil diagram 15.Filling the system Gas installation It is recommended that any air is purged from the supply at the gas inlet test point on the gas valve, see Open the boiler isolating valves (a, b and cdiagram 16) and cap on automatic air vent on topof boiler.
Gas inlet pressure test point Open bleed vent (item 10) on flow pipe to storagetank, see Important: diagram 4 If this procedure is not carried outproperly, the boiler will go into safety lock-out until all the air has been purged. , until all the air has beenreleased from the boiler. Bleed each radiator until a continuous jet of wateris obtained.
Reg 018 Do not close automatic air vent cap on top ofboiler.
Diagram. 15 Open various hot water taps to bleed system. Gas pressures The main burner pressure should be checked during commissioning to make sure the correct input is obtained. Proceed as follows: Make sure that pressure gauge reads between 1and 2 bar. Re-pressurise as necessary. Important: Shut down boiler. When venting air from boiler, do not touch the schrader valve on the expansion vessel, it is NOT a vent. Starting the boiler First starting up Undo screws on gas inlet test points RMP and MP Before starting the boiler check that: - The gas meter tap is open. - The boiler gas service cock is open. - The boiler is connected to the electrical supply. below sealed combustion chamber, see diagram17. Connect a suitable pressure gauge. Gain access to the rear of the control panel andlocate the range rating adjuster screw, see diagram18. Start boiler as described in ‘ Instructions for Use ’ Set selector switch to heating and hot waterposition. Set boiler thermostat to maximum and check thatany external controls are calling for heat. Referring to ‘ Instructions for Use ’, set boiler to runin central heating mode. Check that the reading on the gauge matchesthat given in ‘ Set boiler thermostat to maximum . Technical data ’ for the type of gasbeing used. Check that any external controls, if fitted, arecalling for heat (set room thermostat to maximum). Adjust the range rating adjuster screw asnecessary to obtain the desired input. Allow the temperature to rise to the maximumvalue, with all radiator valves open. The temperature rise will cause release of the gases contained in the water of the central heating system. - Gases driven towards the boiler will be automatically released through the automatic air vent. - The gases trapped at the highest point of the system must be released by bleeding the radiators. On reaching maximum temperature, the boiler should be turned off and the system drained as rapidly as possible whilst still hot. Shut down boiler. Remove pressure gauge, tighten up test pointscrews and check for gas soundness. Refill system to a pressure of 1 bar and vent asbefore.

bca

Restart boiler and operate until a maximumtemperature is reached. Shut down boiler and vent heating system. If necessary, top up heating system and make sure that a pressure of 1 bar is indicated when system is COLD.
Diagram 16 Pla 194/UK 14
ArchiExpo's Virtual Library: PDF Catalogues | Documentation | Brochures | Manuals | Marine directory | Specifications | Characteristics
Search Go
page 1 p.1
page 2 p.2
page 3 p.3
page 4 p.4
page 5 p.5
page 6 p.6
page 7 p.7
page 8 p.8
page 9 p.9
page 10 p.10
page 11 p.11
page 12 p.12
page 13 p.13
page 14 p.14
page 15 p.15
page 16 p.16