Catalogue Absorption
www.sanyoaircond.com
print switch display
Page / 50
Make a request   
SANYO air conditioning - 110055, 16750, 18503
/ 50
See other catalogues for SANYO air conditioning
Text version of the page
ENVIRONMENTALLY FRIENDLY TECHNOLOGY
SUPER ABSORPTION
Installation and application data
Location and space requirements
The unit is designed for indoor application and must be located in a space provided on either end to facilitate tube cleaning, or removal and clear-where the surrounding temperature of equipment is between 5°C and ance on all other sides of the unit for general unit maintenance. See the 45°C, and at no more than 90% relative humidity. Clearance must be dimensional data tables manufacturers for clearance requirements.
Water piping should be arranged so that the circulating pumps discharge directly into the vessels. The water piping should be insulated to reduce heat gain and to prevent condensation. Air vents should be located at all high points in the water piping system, and drains should be located at all low points to facilitate complete system drainage. To reduce vibration
and noise transmission, vibration absorbers should be provided. Shutoff valves should be provided to allow unit isolation during maintenance. Chilled water flow architectural switch is provided on the unit and is preset to open at approximately 50% of specified flow rate.
Field piping instruction
In order to prevent freeze-up of chilled water during unit shutdown, the chilled water pump(s) and air handler must be run for 15 minutes after the burner is shut off. This will allow time for the automatic dilu­tion cycle to be completed.
The standard unit must not be subjected to water pressures in excess of 981 kPa (10 kg/cm2G).
An expansion tank should be provided in the chilled/hot water line. Thermometers and pressure gauges should be field-installed at the inlet and outlet of the chilled/hot water line, and the cooling water line.
5. During heater operation, the cooling water circuit should not be in operation and should be blown down.
6. All external piping connections are provided with JIS 10K flanges un­less noted.
7. A drain line must be installed from the smoke chamber drain to a floor drain.
8. See Figure 32 (DE), Figure 48 (NE), Figure 61 (LE) for typical sys­tem piping arrangement.
Leveling requirements
Strict leveling tolerances must be adhered to for trouble-free operation. SANYO units are furnished with four leveling reference points, one on each corner of the lower shell or tube sheet. Each reference point is designated by three punch marks. A convenient method to check level­ing tolerances is to fill a clear vinyl hose with water and measure the
difference in the water level at the two points. The tolerance that must be maintained from end-to-end and side-to side is 1mm (1/25") of difference for each 1m length between points. It is not necessary to check levels diagonally. When the unit does not meet this requirement, the unit must be shimmed in order to meet leveling tolerances.
(BcPI) dOjp 9JnSS9Jc|
88
ArchiExpo's Virtual Library: PDF Catalogues | Documentation | Brochures | Manuals | Directory | Specifications | Characteristics
Search Go
page 1 p.1
page 2 p.2
page 3 p.3
page 4 p.4
page 5 p.5
page 6 p.6
page 7 p.7
page 8 p.8
page 9 p.9
page 10 p.10
page 11 p.11
page 12 p.12
page 13 p.13
page 14 p.14
page 15 p.15
page 16 p.16
page 17 p.17
page 18 p.18
page 19 p.19
page 20 p.20
page 21 p.21
page 22 p.22
page 23 p.23
page 24 p.24
page 25 p.25
page 26 p.26
page 27 p.27
page 28 p.28
page 29 p.29
page 30 p.30
page 31 p.31
page 32 p.32
page 33 p.33
page 34 p.34
page 35 p.35
page 36 p.36
page 37 p.37
page 38 p.38
page 39 p.39
page 40 p.40
page 41 p.41
page 42 p.42
page 43 p.43
page 44 p.44
page 45 p.45
page 46 p.46
page 47 p.47
page 48 p.48
page 49 p.49
page 50 p.50
pdf-page pdf ae En 2008-10-42-14