| 2.Factory test Tests below are carried out in the SANYO factory. •Check of external dimensions •Leak test (vacuum side and gas train) •Hydraulic test of water headers •Electric insulation resistance test •Dielectric breakdown test •Function test of electric circuit and safety devices •Performance test only for one section shipping unit. * One unit is tested when several units of the same model are ordered for one project. 3.Scope of supply of the purchaser (1) Unloading, transportation, and insurance depend on the individual sales contractor between your company and SANYO groups. (2) Foundations with foundation bolts. (3) External chilled/hot water, cooling water, fuel gas and flue piping work including various safety valves, isolating valves, etc. (4) Rupture disk, flange of rupture disk, bolts, nuts, piping work and tank, etc, if necessary. (5) External wiring and piping for the chillers including necessary parts. (6) Insulation for the chillers including necessary parts. (7) Mating flanges, gaskets, bolts and nuts •Gas inlet nozzle flange of gas train. •Exhaust gas outlet nozzle flange. •Inlet / outlet nozzle flanges of chilled/hot water, (evaporator) •Inlet / outlet nozzle flanges of cooling water, (absorber / condenser) (8) Finish painting of the chillers. (9) Cooling water inlet temperature control device. (10) Various temp. / press, gauges for gas and water lines. (11) Cooling tower (s), chilled water pump (s), hot water pump (s) and cooling water pump (s) and its auxiliary accessaries. (12) Electric power supply (specified value). (13) Supply of chilled water, cooling water, hot water and gas at rated conditions. (14) Necessary tools, workers and materials for installation and site test operation. |