Swimming Pool & Terraces - 36 Pages

  1. P. 1

  2. P. 2

  3. P. 3

  4. P. 4

  5. P. 5

  6. P. 6

  7. P. 7

  8. P. 8

  9. P. 9

  10. P. 10

  11. P. 20

  12. P. 30

Catalogue excerpts

SWIMMING POOLS AND TERRACES Construction and rehabilitation

 Open the catalogue to page 1

Important construction information for making the tank    4 - 6 Building a pool with system 9, step by step    7 - 11 Position of accesories in swimming pools    12 Installing the ceramic rungs in pools    13 Execution Specifications the correct way to build a swimming pool    14 the correct construction of a private swimming pool without waterproofing 15 RENOVATING POOLS Conversion of a skimmer pool to a deck level pool    16 - 19 Execution Specifications Renovating a pool without removing the old covering    20 Renovating a stainless steel swimming pool or spa    21 Renovating a polyester pool...

 Open the catalogue to page 2

This brochure aims to set out the most important building tasks in the execution of a terrace and a swimming pool in this guide, whether for a new build or a renovation. We also offer some practical fact sheets for carrying out this work, which will be of great help to professionals. This brochure is a tool to assist builders and fitters, who will find new and unique solutions that will save on costs and help avoid pitfalls. It has been developed thanks to ROSAGRES and FIXCER depth knowledge of the construction site. Together they have set out quality solutions for construction to ensure the proper...

 Open the catalogue to page 3

NEW BUILD POOLS IMPORTANT CONSTRUCTION INFORMATION FOR MAKING THE TANK When deciding on the final distance between the concrete walls, take into account the fact that the waterproofing, the screed, the cement glue and the ceramic tile are approximately 3.5 cm (1.37 ") thick at each of the walls. Therefore if the finished pool must be 25m, the distance between walls cannot be less than 25.07 m. For competition pools, an additional 1.5 cm should be taken into account to place the touchpads. Therefore, if we are trying to standardise a 25m pool, this should have a distance of 25.03m between both...

 Open the catalogue to page 4

NEW BUILD POOLS IMPORTANT CONSTRUCTION INFORMATION FOR MAKING THE TANK DISTRIBUTION OF POOL COMPONENTS BEFORE INSTALLATION MARKING THE POOL 1 1 Begin tiling the walls following the coloured lines previously marked. 2 Cross-pieces can be used on the verticals, inserting them between the pieces as shown in the photograph. 3 Once all the walls have been tiled, place the parts on the bottom of the tank. 4 Cross-pieces do not need to be used for the flooring as final adjustment of the pieces can be carried out by hand, always following the lines. Place the special corner pieces, according to the type...

 Open the catalogue to page 5

NEW BUILD POOLS IMPORTANT CONSTRUCTION INFORMATION FOR MAKING THE TANK WATERPROOF GROUT EXPANSION JOINTS Another way of improving the watertightness of the tank is to use a fully watertight, flexible and acid-proof mortar such as CERPOXI. The structural joints of the pool, if any, have to be respected and place expansion joints every 25 square metres and/or 5 linear metres, as a maximum. The JUNTATEC coloured mortar is a very good alternative. . It is resistant to weak acids and has a residual absorption value of just 2%. For the sealing, use SELLALASTIC FOAM as grouting and SELLASTIC elastic...

 Open the catalogue to page 6

NEW BUILD POOLS BUILDING THE OVERFLOW DRAIN: SYSTEM 9 System 9 is a pre-fabricated coping system. It comprises of a set of water-repellent concrete blocks designed so that a singlepiece acts as a drainage channel and tile support. THE 9 ADVANTAGES OF S9 1. Reduces the costs of the concrete overflow system construction. 2. Speeds up the installation processes, saving time and labour. 3. Facilitates the layout of the parts as they have been designed to favour the installation process. 4. Improves the top finish of the concrete gunite walls. 5. Avoids the shortcomings that are often present as a...

 Open the catalogue to page 7

NEW BUILD POOLS BUILDING THE OVERFLOW DRAIN: THE S9 BLOCKS ERGO SYSTEM Ref. RS 902 OPEN WILT-IN STEPS FINLANDES HORyZON SYSTEM Ref. RS 912 OPEN BUILT-IN STEPS Ref. RS 916 RIGHT OPEN STEPS Ref. RS 917 LEFT OPEN STEPS

 Open the catalogue to page 8

NEW BUILD POOLS BUILDING THE OVERFLOW DRAIN: THE S9 BLOCKS Ref. RS 922 OPEN WIT-IN STEPS Ref. RS 923 INSIDE CORNER Ref. RS 921 base weight: 20 Kg

 Open the catalogue to page 9

NEW BUILD POOLS BUILDING A POOL WITH SYSTEM 9, STEP BY STEP The concrete is cast, forming the walls, tank bottom and perimeter low wall, leaving a reception area for laying the S9 block according to its measurements. We start by positioning the pieces of the corners using a laser level. We place twine between them. Then we position the S9 blocks between corner and corner. It is also essential to place mortar in the joint between the blocks. Once the blocks have been positioned the back gap is filled with concrete. To simplify the process of concreting, this may be done in two stages. First a flat...

 Open the catalogue to page 10

NEW BUILD POOLS BUILDING A POOL WITH SYSTEM 9, STEP BY STEP The waterproofing of the tank is carried out with an elastic type of waterproofing, such as HIDROELASTIC , on which the tiles will be placed on top. And the waterproofing of the channel is done using a waterproofing such as HIDROFIX. Laying the ceramic tiles: use an adhesive cement type C2 T S1 suitable for adhering the porcelain stoneware on top of waterproofing, such as TECNOCOL FLEX. System 9 can be used for both straight and curved swimming pools. 4 Drainage recommended approx every 4 m. 1 Expansion joint essential perimeter throughout...

 Open the catalogue to page 11

NEW BUILD POOLS Position of accesories in swimming pools 2 FLAGS. Signs for backstroke, made up CORK FLOAT LINE fitted with floats, polyester rope and hooks. from 4 stainless steel poles 1.8 m in height. 3 SIGNS FOR A FALSE START made up from 2 stainless steel poles 1.8 m in height. 1 7 4 ANCHORAGE made from stainless steel. 2 6 SWIMMERS STARTING BLOCKS in stainless steel. Adjustable polyester and fiberglass platform. 7 STEPS with Ø 43 handrail and non-slip steps. CORK FLOAT LINE SIZES

 Open the catalogue to page 12

NEW BUILD POOLS Installing the ceramic rungs in pools Insert a rod (preferably stainless steel) through each of the holes of the step Ref. 019 making them protrude at both ends. Fill the gaps in the blocks with non-shrink ,GROUT S10 mortar placing 6 mm cross-pieces between them. Place the rungs in their position. If an insertion groove of the tank has not been planned on site, dig to open one up. Cover the insertion groove holes with epoxy mortar such as EPOXICOL.

 Open the catalogue to page 13

All Rosa Gres catalogues and technical brochures

  1. Mosaic

    7 Pages

    En
  2. Unique Exteriors

    60 Pages

    En
  3. Unique Pools

    31 Pages

    En
  4. Biostop

    12 Pages

    En
  5. vintage

    9 Pages

    En
  6. mistery

    9 Pages

    En
  7. garden

    11 Pages

    En
  8. bohème

    13 Pages

    En
  9. Natural 2.0

    13 Pages

    En
  10. Proyecta

    11 Pages

    En
  11. Technical Floors

    11 Pages

    En
  12. PerfectPools

    25 Pages

    En
  13. Mosaic

    7 Pages

    En
  14. Tao

    9 Pages

    En
  15. Serena 2015

    13 Pages

    En
  16. IMAGINA

    15 Pages

    En
  17. LOVELY

    11 Pages

    En
  18. Imagina

    14 Pages

    En

Archived catalogues

  1. Unique Pools

    31 Pages

    En
  2. Unique Exteriors

    29 Pages

    En
  3. CONCEPT

    13 Pages

    En
  4. Garden 2015

    20 Pages

    En
  5. Bohème 2015

    24 Pages

    En
  6. MISTERY

    16 Pages

    En
  7. TAO

    16 Pages

    En
  8. VINTAGE

    16 Pages

    En