Stand
Group: ASSA ABLOY Entrance Systems
video corpo

Megadoor, Oyu Tolgoi Gobi of Mongolia - 2 Pages

Mining: Oyu Tolgoi, Gobi of Mongolia New door installations

Reliable door performance in a tough environment

The world's largest undeveloped copper

deposit, which also turns out to include

significant deposits of gold and silver, is

located in the Gobi of Mongolia at a site

called Oyu Tolgoi, which means "Turquoise

Hill". The Oyu Tolgoi site is the signature

feature of Ivanhoe Mine's flagship project.

The concentrator's quickly evolving shape

is a barometer of the pace of the full-scale

construction now underway on what will

be one of the world's largest copper, gold

and silver mining complexes. The concentrator

initially will process 100,000 tonnes of ore

perday minedfromthe open pit, increasingto

up to 160,000 tonnes a day when ore from

the underground mine is added in 2015.

During the first 10 years of production, the

complex will produce a projected average

of 1.2 billion pounds of copper, 650,000

ounces of gold and three million ounces of

silver - every year.

Challenges / Critical Issues

High Wind load: Wind speed in the

Gobi desert can reach up to 200 km/h.

Doors need to withstand the wind

loads of hurricanes.

Cold Weather: Winter temperature

in the Gobi desert can reach as low as

-35- -40° C. All building facilities and

equipments must perform at extremely

low temperatures.

Excessively dusty condition: The dust

and sand in Gobi desert makes the

building difficult to keep clean. The

workshop needs to stay clean for equipment/

truck repairs and maintenance.

No immediate service: Immediate service

is difficult to achieve in the deep de-

sert. All facilities need to be reliable

and stable. Highly reliable equipment

with low service and maintenance

needs help keep downtime to a mini-

mum.

Megadoor provided

• 1 Megadoor S800 in lube storage size,

4000x4000mm

• 1 Megadoor S800 in welding and

machine shop size, 4500x4500mm

• 2 Megadoor S1000 in wash bay size,

5000x5000mm

• 2 Megadoor S1500 in welding and tire

shop, size 8000x8500mm

• 12 MegadoorS1500intruckshop

size, 12000x10600mm

• 7 Megadoor S800 in mineral

processing workshop various size

• 9 Megadoor S1000 in mineral

processing workshop various size

• Locally based services; design

assistance, technical advice and

installation

• Translucent fabric to allow more

natural light into the building, which

improved the working environment

• On time delivery and installation

• After sales assistance anda

maintenance contract, undertaken

by locally based technicians k k

Megadoor, Oyu Tolgoi Gobi of Mongolia
  1. P. 1

  2. P. 2

    Benefits Withstand high wind loads: Megadoor is designed to withstand at least 1.8KPa wind load, which was the customer requirement. The Megadoor...
Text version

All Megadoor catalogues and technical brochures

  1. Megadoor, China

    1 Pages

    En

Archived catalogues