Catalogue General Brochure
www.kingspanaccessfloors.co.uk
print switch display
Page / 16
Where to buy
this product ?
Request
a Quote
Kingspan Access Floors - 26356, 19238
/ 16
See other catalogues for Kingspan Access Floors
Text version of the page

ment solution

The modern style of office development basedaround open plan offices with design workstations causes constant changes in desk layout, services etc. which require the initial cable management design to be substantially modified on a regular basis - CHURN.Every time these distribution systems need to bemodified the raised floor offers considerable cost savings, at least 50%!To alter or amend the services with a raised floorrequires the simple lifting of a design panel, introduction of the new cables etc. and then replacement of the same panel.This is virtually impossible with old fashionedcable management systems, such as sub floor trunking, where it is necessary to either scabble the concrete slab or introduce a new piece of trunking before making good the slab.

7
ArchiExpo's Virtual Library: PDF Catalogues | Documentation | Brochures | Manuals | Directory | Specifications | Characteristics
Search Go
page 1 p.1
page 2 p.2
page 3 p.3
page 4 p.4
page 5 p.5
page 6 p.6
page 7 p.7
page 8 p.8
page 9 p.9
page 10 p.10
page 11 p.11
page 12 p.12
page 13 p.13
page 14 p.14
page 15 p.15
page 16 p.16
pdf-page pdf ae En 2008-12-49-05