TREWALL®- Laying Instructions Mise en oeuvre
The Trewall system consists in covering the entire building with a supporting blind metal structure and an integral one with ribbed staves connected by a seaming system. Finally, the insulator and the external claddings are laid down. We have improved the entire system to simplify the laying operations.
Listed below are some basic rules to be followed for a correct execution:
Le système TREWALL est constitué par une structure métallique nervurée porteuse et aveugle assemblée par agrafes. Les instructions pour une correcte mise en oeuvre sont:
The blind structure is bolted to the continuous L-shaped steel profiles which have been previously positioned on the perimetric outline of the slabs, on Halfen bar crops (as an alternative.anchoring can be obtained by using plugs).The Halfens should have dimensions suitable to support all the working loads bearing down on the facade.
Thanks to the cross slot system, present on all components, precise alignments can be obtained based on the X Y Z positions.
Laying of the vertical rods is easy and effective. Specifically, the system allows for thermal dilations without creating any induced tensions.
The perfect flatness and alignment of the facade is also ensured by the slots situated on the secondary vertical rods which enable a further adjustment of possible out of plumb.
The wall frames and the window and door intrados can be connected to the secondary vertical rods.
The finishing metal elements at the bottom and top of the ventilated facade, such as flashings and drips, must not interfere with the air ascensional motion.
It is advisable to install an anti-intrusion net for insects and birds at the base of the ventilation interspace.
The ribbed sheets and the eventually required preassembled cells may be produced directly on site or at our factory, based on the quantities required and the type of construction site.
The laying speed enables water proofing of the building in just a few working days, making it possible to start the finishing internal works such as floors, coatings, false ceilings, installations, etc... way ahead even under most unfavourable weather conditions.
L'accrochage de la structure aveugle s'effectue par boulons aux charpentes en acier avec section en 'IL Les sections en V de la charpente sont fixées sur morceaux de rails type Halfen noyés dans le béton.
Grâce à un système de boucles croisées placées sur les éléments du système TREWALL on va obtenir des alignements corrects suivant les placements XYZ.
La mise en oeuvre des charpentes verticales est simple, le système permet les dilatations thermiques sans créer des tensions induites.
La parfaite planéité de la façade et l'alignement sont assurés par des boucles placées sur les profilés Alu verticaux qui permettent le réglage de l'hors plomb.
Sur les profilés Alu verticaux on pourra fixer les faux châssis et les intrados des cadres.
Laying stage of the Trewall blind structure Phase de mise en œuvre structure avengle Trewall
Laying of the external covering sheets made of écologie asbestos cement (use of a fixed scaffold) Mise en œuvre tôles de revêtement extérieur en fibrociment écologique
Detail of the blind wall and packed in insulator (use of mobile scaffold) Détail parol avengle et isolan t confectionné
11
12
ArchiExpo's Virtual Library: PDF Catalogues | Documentation | Brochures | Manuals | Directory | Specifications | Characteristics
Search Go
page 1 p.1
page 2 p.2
page 3 p.3
page 4 p.4
page 5 p.5
page 6 p.6
page 7 p.7
page 8 p.8
page 9 p.9
pdf-page pdf ae En 2008-12-49-01