Site preparation PasSec D
One Lane or more Lane configuration are available for the PasSec D. The example below shows the PasSec D Two Lane Configuration. (
Doors suppliers and wings shown in closed position. Corridor connection is not shown) High level traffic flow indicator Black rubber door panel buffer. 12mm clear tempered glass door panel guide rails Concrete to UNI 9858, RCK250 type. Base to be flat and level to +/-5mm ove r footprint area. 2300x1300x150 mm min. 10mm clear tempered
glass panels >
Unit in mm
Corridor Is not shown SeeGeneral Lane configuration Note (1) Low level mains power and data entry Variable length and or Anti-Throw angle Corridor Connection minimum recommended length is 2.2m Low level mains power and data entr y cable and conduit is required to connect the two Full Height Doors Corridor is notsu pp lied Corridor Is not shown SeeGeneral Lane configuration Note (1) No Entry Exit direction only Corridor Is not shown SeeGeneral Lane configuration Note (1) IMPORTANT Any horizontal pipe or conduit runs below the PasSec must be at least 140mm below. The dimension reported on this Product Data Sheet are for information only. In order to prepare the Installation Site, p lease refer to the la y -out drawin g s p re p ared b y Gunnebo Entrance ControlS p A or ask confirmation. >
GI-PDS-PASSEC-uk-issue 4-27.01.2005 5 >