FOS AT91S Site Preparation.
A nchor holes M10 bolts x 100mm deep min. (drilled during installation) Cable entry zone Unit in mm Concrete to UNI 9858, RCK250 type. Base to be flat and level to +/- 5mm over the FOS footprint area. Cables metal conduit, shall come up at least 50mm from foundation IMPORTANT An y horizontal pipe or conduit that runs below the HiddenGtae must be at least 140mm below >