FOS 91S Site Preparation.
6 anchor holes for TPSEI M10 bolts x 125mm deep min. (drilled during installation) Cable entry zone Unit in mm Concrete to UNI 9858, RCK250 type. Base to be flat and level to +/- 5mm over the FOS footprint area. Cables metal conduit, shall come up at least 50mm from foundation IMPORTANT Any horizontal pipe or conduit runs below the FOS 91 must be at least 140mm below. The dimension reported on this Product Data Sheet are for information only. In order to prepare the Installation Site, please refer to the lay-out drawings prepared by Gunnebo Entrance Control SpA or ask confirmation. >
GI-PDS-FOS 91-UK-issue 3-24.01.2005 3 >