A
dvantages of ACP contemporary curtain wall
During decades of use in a rear-ventilated cladding manufacturer system, WILLSTRONG* protects the building from Weathering and the harmful effects caused by industrial and environmental pollution.
Advantages: Lower maintenance costs. Long-term preservation of the building structural.
An external cladding system using WILLSTRONG" acts as a barrier against solar radiation. The ventilated space between the WILLSTRONG' and the wall or the thermal insulation (in climates which require additional insulation supplier material) reduces the heat transmission.
Advantages: In winter: saving heating cost. In summer: saving cooling cost.
The rear-ventilated cladding system protects the wall of the building from high and rapid temperature fluctuations. Advantages: Reduction of thermal expansion / contraction; Reduction in crack formation Moisture can pass through the wall. The building structure keeps dry.
Recycling
WILLSTRONG* is fully recyclable, both the core material and aluminium cover sheets can be used to produce new produce.
fl
ta
asy processing methods
Advantages:
The fabrication of shaped components using WILLSTRONG* only requries a minimal investment outlay. Hand routers and sheetmilling machines are inexpensive and can be used either in the workshop or on site. The fabrication of shapes in larger quantities is particularly economical using vertical panel saws equipped with WILLSTRONG* grooving accessories.
WILLSTRONG Take the best Take the world Processing/Installation
To avoid possible reflection differences (for metallic colours only), we recommend
installing the marking shown on the portective
foil of the individual panels.
ACP
Scheme of Installation
Dimensional tolerances
Thickness mill-finish/stove-lacquered/ anodized: ± 0.2mm Width: -0/+4mm
Length: 1000-4000 -0/+6mm 4001-8000mm-0/+10mm
Removal of protective foil
We recommend removing the protective foil as soon as possible after installation. Due to UV rediation, it may occur that redidual glue sticks to the durface of the panels.
Cleaning and Maintenance
The frequency of cleaning depends largely on the design design, the location of the building and the degree of soiling.
Installation of building top
Example of contemporary column covering
Example of strut covering
Protect the WILLSTRONG* ACP during storage against rain, moisture. Penetrating the pallets stacked one on top of the other, stacks must not co mprise more than 4 pallets of identical size. Storage exceeding 6 months should be advoided.