| Installation: Laying is the responsibility of the fitter. Installation has to be in accordance with the latest installation instructions available from our Technical Department. Subfloor to be smooth, hard, clean and dry prior to laying. Where applicable the subfloor must incorporate an effective Damp Proof Membrane. The material must be allowed to acclimatise for 24 hours before installation in a room temperature of between 18-24°C. All seams must be heat welded using Gerflor weld rod. |