Catalogue EUROPE METAL SLATE
www.twintile.be
print switch display
Page / 4
Contact the
Manufacturer
Where to buy
this product ?
EUROPE TWIN TILE - 780
/ 4
See other catalogues for EUROPE TWIN TILE
Text version of the page

INSTALLATION INSTRUCTIONS

Profile-J Profile-J IN GENERAL : • Use a roof membrane for roofing and wall cladding

1

• Place the slates upwards • Fasten the slates and accessories with alu-zinc nails (+/- 28 mm) • Cut the slates using zinc shears FINISHED WALL CLADDING : • Place the battens vertically (distance between the battens 159 mm for Metal Slate’20, 230 mm for Metal Slate ’30, 283 mm for Metal Slate ’40)

2

• Underside : Place the Slate Profile-J and start with a Start Slate as shown in fig. 1 • Side and top side : Place Slate Pofile-J as shown in fig. 1 • Edges : use Slate Cover Flashing mini to finish

3

FINISHING ROOFING: •
Slate Profile-J Place the slates onto an underground made of natural wood to which a roofmembrane is attached • Start by placing the accessories (Slate Eave Aprons, Slate Barge Board Covers, SlateValley if necessary)
Barge board cover • Install a Slate Eave Apron as shown in fig. 2 and start with a Start Slate

4

• Install a Slate Barge Board Cover with Slate Profile-J into the smooth surfaceagainst the sharp edge as in fig. 3 and 4 (fasten the Slate Profile-J onto the Slate Barge Board Cover)
Slate Profile-J • Install a Slate Valley with Slate Profile-J against the sharp edge as in fig. 5 (fastenthe Slate Profile-J onto the Slate Barge Board Cover) • Install the slates upwards

5

Valley • Fasten Slate Ridges onto the batten for ventilation see fig. 6
Ridge Batten Slate

6 7

ArchiExpo's Virtual Library: PDF Catalogues | Documentation | Brochures | Manuals | Directory | Specifications | Characteristics
Search Go
page 1 p.1
page 2 p.2
page 3 p.3
page 4 p.4
pdf-page pdf ae En 2008-12-49-03