DEVOREX_PRIME
2Pages

{{requestButtons}}

Catalog excerpts

DEVOREX_PRIME - 1

1. PRIME 125 GUTTER 3M 2. PRIME 125 GUTTER UNION 3. PRIME 125 RUNNING OUTLET 090 4. PRIME 125 GUTTER ANGLE 90° INTERIOR 5. PRIME 125 GUTTER ANGLE 90° EXTERIOR 6. PRIME 125 GUTTER FASCIA BRACKET 7. PRIME 125 GUTTER STOPEND - RIGHT 8. PRIME 125 GUTTER STOPEND - LEFT 9. RAINPIPE 090 PIPE 3M 10. RAIN PIPE 090 PIPE CONNECTOR 11.RAINPIPE 090 BEND 67.5° 12. RAINPIPE 090 ENDING BEND 13. RAINPIPE 090 PIPE BRACKET 14. RAINPIPE 090 BRANCH 67.5° 15. PRIME 125 RAFTER BRACKET 16. RAINPIPE 090 PIPE BRACKET ADAPTER L120.L160 1. Mark the position of the running outlet on the fascia. On 15 cm from each edge of the running outlet, fix a gutter fascia barcket, using 3 srews M4x35. 3-b. In cases when fascia board is absent, fix the gutter fascia brackets directly to the roof ribs, using rafter brackets bended accordingly to the roof slope. 4. Decide on the position of the gutter unions and angles. If necessary, cut the gutter to the according lenght by using hacksaw, considerin the insertion mark on each fitting. Smoothen the cut edges with a rasp. 3-a. Using screws, secure the gutter fascia brackets in the midlle to the fascia board at a maximum distance of 60 cm from each other. 5. Insert the front edge of the gutter fascia bracket into the front fold of the gutter. Ease the back edge of the gutter down and backwards untill it snaps into place under the rear edge of the gutter fascia bracket or connecting fitting. DESIGN STORAGE Design should be performed by an authorized and experienced designer, considering the requirements ofEN 12056-3 and strictly following all national and local building codes and standards. The product is fit for rainwater handling from the roofs of residential, administrative and light industry buildings. DRAINAGE CAPACITY All calculations are based on rainfall intensity -SOUlmfxhour) ( \ Gutters and downsputs shall be stored and transported on a flat surface in a horizontal position. The bottom layer of gutters and pipes shall be placed on a level supporting base and shall be in full contact with the base. Acceptable height of the storage pile is 1 meter. Any sharp edges of stands or vehicles, which remain in contact with gutters shall be protected, e.g. with wooden boards. Fittings packed in cardboard boxes, shall be stored and transported under roof. During the transportation the load must be restrained to ensure no load movement. It is recommended to load/unload the boxes by hand. In case of using loading/unloading equipment one should avoid crushing the products and throwing them. Most fittings are packed in individual plastic bags. Avoid leaving it exposed to sunlight for a long time. '---/

Open the catalog to page 1
DEVOREX_PRIME - 2

7. Installation of running outlet - locate the rare edge of the gutter under the rare edge of the fitting. Ease the front edge of the gutter downwards until it snaps into the runing outlet. When positioning the gutter into the fitting consider the insertion mark on each fitting. Fix a gutter fascia bracket on both sides of the running outlet at an equal distance of 15 cm. 8. Two gutters are connected by a gutter union. The installation of the gutter into the gutter union is analogical to that of the running outet. When positioning the gutter into the fitting consider the insertion mark on...

Open the catalog to page 2

All DEVOREX PLC catalogs and technical brochures

  1. WPC DECKING

    2 Pages

  2. Soffit

    2 Pages

  3. Fencing

    2 Pages

  4. FAVORIT 130

    2 Pages

  5. SOFFIT

    2 Pages

  6. PRIME 125

    2 Pages

  7. PPR pipes

    2 Pages