Diversity in installation positions
The room layout around a contract door determines where and how an professional air curtain can be best installed. Thanks to a diverse range of installation positions, the IndAC air curtain can be matched to the possibilities offered by the local situation.
The units should be positioned above or next to the door, covering the full length or width of the doorway. Depending on the situation, the air curtain is either installed horizontally above or vertically next to the door (to the left or right or on both sides). There are a total of five installation positions, which are shown below.
Installation position
Explanation
Horizontal
- above door opening
0
Vertical
- right side of door opening
- square to wall
1R
Vertical
- left side of door opening
- square to wall
1L
Horizontal installation (position 0): excellent to combine with overhead door systems.
Vertical
- right side of door opening
- parallel to wall
2R
Vertical
- left side of door opening
- parallel to wall
2L
Example of vertical installation (position 2R): to the right and parallel to wall.
Air dire
Wall
Door
* Inspection side
7
ArchiExpo's Virtual Library: PDF Catalogues | Documentation | Brochures | Manuals | Marine directory | Specifications | Characteristics
Search Go
page 1 p.1
page 2 p.2
page 3 p.3
page 4 p.4
page 5 p.5
page 6 p.6
page 7 p.7
page 8 p.8
page 9 p.9
page 10 p.10
page 11 p.11
page 12 p.12
page 13 p.13
page 14 p.14
page 15 p.15
page 16 p.16