38 KeraTwin K3
Fastening KeraTwin K3 with invisible fastening onsupporting rails
Essential system advantages •Reliable budget planning•Great design scope thanks to a wide variety of sizes and colours•All glazed and unglazed surfaces of the facade
design panels with Hydrotect coating•Rapid and safe mounting with well thought-out systemcomponents•Permits the combination with commercially available base constructions•Mitre-cut angles are possible, see page 25 The system KeraTwin K3 comprises KeraTwin facade panels, sup-porting rails optimized as regards application and all necessary
fastening means.
The system KeraTwin K3 was specially developed for the quick
and simple, invisible fastening of large and small facades of new
buildings and renovation projects.
The system KeraTwin K3 is delivered completely to the con-
struction site ex works. Separate deliveries of ceramics and
substructures are possible if agreed in advance. System description The small-size facade panels KeraTwin K3 have grooves on theback and are simply hung in the supporting rails mounted in the
grid. These supporting rails in turn are mounted on a commer-
cially available vertical base construction by means of format-
specific distance jigs (see page 41).
This supporting rail is an integral part of the system KeraTwin K3
and precisely adjusted to the panel elements. It is of course
optimized as regards application technique.
The facade panels are secured by compression springs mounted
in the vertical joint (nonrigid installation). >
KeraTwin K3 grooved
KeraTwin K3 KeraTwin Wall construction KeraTwin K3 with supporting rail
KeraTwin K3 with supporting rail Important: The use of silicone caoutchoucs must be absolutely avoided, because silicone fluids
segregate and effect sticky surfaces on which dirt adheres. Therefore, only use the
system components mentioned (foamed piece, EPDM rubber profile, neoprene rub-
ber washer) and pointing, bonding and sealing materials recommended by us. We
will be pleased to inform you in detail. The usual final cleaning after completion of
the construction works is still required.